Find the design records behind your undelivered prepaid order
Recover and check approved specification records for replacement manufacture after loss of a supplier deposit.
Corporate Recovery Partners
01 / 06
The missing deposit may not be the only setback
Your supplier enters administration with money paid for custom materials. You find another manufacturer, but the final dimensions and approved drawings are held by the old supplier. Before commissioning a replacement, establish which records you have, which are missing and whether you are entitled to use them. Guessing from an early quote can create a second expensive problem.
Imagine a shopfitter who paid a deposit for bespoke counters. Several revisions changed the service openings and finish, but only the original drawing is saved in the project folder. Search authorised email and document records for the approval trail. Record the revision, who approved it and any later site change that may not yet appear on the drawing.
business.gov.au recommends secure storage and backups for business records. Keep the original files and messages together rather than replacing everything with one newly edited drawing. A replacement manufacturer needs to know which requirements are confirmed. Mark uncertain dimensions clearly so an old measurement is not treated as an instruction to manufacture.
Contact the administrator through verified details and describe the files you need. Ask who can respond and what process applies. Obtain advice about ownership, confidentiality and permission to reuse the designs where necessary. Paying a deposit should not be treated as conclusive proof that you own every drawing or can access the supplier's systems.
Have the appropriate project person check the confirmed design against current requirements before ordering. In the counter example, a services change may have occurred after the last approval. Document any correction and obtain the necessary customer or designer approval. Do not ask the replacement supplier to infer a final specification from conflicting attachments.
Retain the original deposit evidence for the administrator while recording the new order, approved specification and delivery commitment independently. Explain the additional time needed to confirm the design without promising a premature completion date. Recovering accurate project information can protect the replacement decision even where the outcome of the original deposit claim remains uncertain.