The debt problem has returned
The business previously reached a rescue arrangement, but cash pressure has appeared again. Before preparing another optimistic forecast, compare the earlier plan with actual results. This commercial review does not determine eligibility for a formal process. It helps explain what changed, what was misunderstood and what evidence supports any claim that a different approach can now work.
Locate the forecast, agreed actions and reporting used at the time, rather than a later revised spreadsheet. Identify the main assumptions about receipts, margins and costs. Keep the original intact. If the plan was never written down, say so and distinguish present recollection from an actual contemporaneous record of what the business expected to achieve.
Business.gov.au's cash-flow guidance distinguishes estimates and records incoming and outgoing cash. Use that structure to examine the earlier assumptions. Identify where the difference first became material. Avoid explaining every shortfall as bad luck if the records show a repeated operating issue, but also avoid blaming an individual for an assumption without understanding the information available at the time.
Imagine a hypothetical plan depending on completing three projects at a stated margin. Actual records show one project required significant return visits that were not allowed for. A new forecast using the same allowance needs explanation. The example does not prove the business is beyond recovery; it identifies an assumption that should not simply be copied into another proposal.
If the business says the problem is fixed, ask what has changed and what results support that statement. A new quoting rule, staffing arrangement or customer term needs a realistic connection to the loss identified. Keep untested changes labelled as assumptions. Do not present an intended improvement as an achieved result merely because another plan requires a stronger forecast.
Give the qualified adviser the comparison together with current debts, cash and formal process history. Eligibility, directors' responsibilities and available options require their own assessment. A useful second discussion acknowledges the previous failure honestly and tests the proposed difference. Repeating the old forecast with a later date does not explain why the returning shortfall would now disappear.